Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Mar 23, 2022     Engine wiring - (4.7 hours)       Category: Firewall Forward
I got a lot done on the firewall-forward wiring today:

1. Organized and ran a couple of wiring bundles through the Adel clamps.
2. Located and drilled another hole in the firewall for an additional Adel clamp.
3. Sheathed the bottom bundle (the one that runs along the bottom of the firewall) with firesleeve.
4. Clamped it in place with the Adel clamps I installed yesterday.
5. Measured, cut and attached a ring terminal to the Standby Alternator lead, and attached it to the Stby shunt.
6. Finalized the connection on the Stby Alternator.
7. Improved the angles of several ring terminal connections.
8. Attached the Main Alternator lead to the Main shunt.
9. Sheathed the vertical run of wires that will go up the left edge of the firewall in firesleeve. Clamped it in one of two locations.
10. Prepped several other wires for being spliced with butt terminals.


 